If this option is enabled, the base cost of a make from item will be automatically derived using the formula
(Real Cost + Freight Rate) / (Yield / 100)
•Utilizing this feature will adjust the base cost for the waste factor.
If there are 10 pounds of whole product and an 80% yield factor, by the time the salable product is processed there would only be 8 pounds remaining.
Assuming the item that is being processed has a real cost of 2.25 per pound and a 0.00 freight rate, the resulting base cost would be 2.8125
(2.25 + 0) / (80/100) = 2.25 / 0.8 = 2.8125
|