1. | Select the item in the line item grid that you will change the base cost. |
2. | Press the F4 key. This will open the Edit Cost dialog. |
3. | Enter the new base cost in the Base Cost field. |
|
|
This option will not be available if the user does not have the Allow editing of Base Cost (F4) in invoicing password option enabled in the Security Manager.
|
•Revised all of the cost calculation features in entrée to enforce the rule that Base Cost is equal to Real Cost plus Freight plus Markup.
Modification # 915 is the old "free form" method which will produce exceptions to this rule for those customers that have it.